Here is a selection of our references:

In the new technical plant, active agents are manufactured up to a quantity of 100 kilograms. Boehringer Ingelheim invested more than 50 million Euros in the facility for the production of newly developed pharmaceutical ingredients. In addition to the technical center, which is located in the lower 3 stories, the facility also has a laboratory level for quality control.
Our services (HOAI performance phases 1 - 8) architecture, structural engineering, building services, laboratory equipment, clean rooms, water supply and waste water, building physics
30,000 m³ (total room area)
2009 - 2014 (period)

Our services (HOAI performance phases 1 - 8 as well as field engineering) architecture, structural engineering, building services, clean rooms, fire protection
57,500 m³ (total room area)
2007 - 2010 (period)

Multiple extensions to Testo Industrial Services in Kirchzarten.
New areas for accredited calibration laboratories, various open-plan and individual offices, meeting rooms, a state-of-the-art training center and new logistics areas have been created.
In order to meet industry standards and to guarantee the accuracy of measurements, the Testo laboratories in Kirchzarten have to maintain stable ambient conditions 24 hours a day, 365 days a year. This is achieved by a unique ventilation and air-conditioning concept.
As part of the expansion, the wooden pellet heating system was expanded. Energy is by ten geothermal probes. In addition, a photovoltaic system on the roof generates additional electricity, which is fed into the public grid.
Our services (HOAI performance phases 1 - 8)
Architecture
Water supply and waste water, gas; Heating systems; Air and refrigeration equipment; Power installations; Telecommunications and information technology installations; Building automation; User-specific equipment (technical gases and laboratory technology), conveying systems

Construction of a two story production facility with 11 packaging lines, laboratories, office and logistics areas, social rooms
Our services (HOAI performance phases 1-8) Architecture, interior architecture, structural engineering, building services, water supply and waste water, building physics, fire protection
35,000m³ (total room area)
2014-2017 (period)

Construction of an industrial facility with production area, logistics, molded part storage, assembly, social rooms and QA laboratory in 2 construction sections.
Our services (HOAI Performance phases 1 - 8) Architecture, building services
Eisenbach
25,200 m³ (total room area)

New Pharma Production Facility for Altana Phama in Cork Ireland with logistic centre and office facilities.
The complex consists of tableting facilities in clean-rooms, offices, quality control laboratories, social areas with restaurant, logistic and warehouse provision with an associated power plant.
Our services (HOAI performance phase 5) architecture
Ed. Züblin AG
BRI ca. 95.000 m³